Home > News > Content

Installation Sequence And Key Steps For Directional Reaming Drill Bits

Jan 17, 2026

1. Pre-treatment

- Clean the drill pipe threads and the internal threads of the drill bit, and apply special lubricant (such as molybdenum disulfide) to reduce friction and wear.

 

2. Alignment and Connection

- Align the drill bit vertically with the drill pipe, and manually screw it in 3-5 turns to ensure proper thread engagement and prevent cross-threading.

 

3. Torque Tightening

- Use a hydraulic wrench to tighten in two stages:

- Initial tightening to 50% of the specified torque (e.g., 7,500 N·m for NC38 threads);

- Final tightening to 100% of the torque (15,000 N·m), referring to the API Spec 7-1 standard.

 

4. Safety Check

- Mark the threaded joint with a marker pen. Regularly observe whether the marked line shifts during construction to determine if loosening has occurred.

Send Inquiry